Proposed Data Center Development

An overview of the massive 280+MW large-scale data center project proposed for Geer Street, impacting 159 acres of our community landscape.

Meeting Post-Moratorium Updates

  • Preliminary conversations between Global Common and Town officials have progressed, though formal site-plan applications remain pending until early 2027.
  • Advocacy groups have successfully petitioned for broader public oversight regarding the proposed 159-acre site use.
  • New infrastructure studies highlight the potential noise and traffic impact on the adjacent middle school and public park areas.
  • Legal representatives for residents are now reviewing the developer's exclusive purchase options for the Geer Street parcels.
2026-10-28-Updated-Concept-Plan-CP4-2048x1365.webp
  • Above figure represents preliminary site plan proposed on Global Common public webpage.

Current Project Plans

  1. The location is on a 153-acre property owned by Jack Gardner/Gardner’s Nurseries located on the Cromwell and Rocky Hill town lines between Geer Street in Cromwell and Brook Street in Rocky Hill.

  2. The proposal calls for multiple buildings, including 4 two-story buildings which will be data centers with 50 parking spaces. The largest data center proposed is to be built adjacent to the middle school, and at least three additional buildings will be developed for fuel cells.

  3. The property shows there will be a guard station at the entrance located on Geer Street, which is a residential neighborhood. Geer Street is highly traveled each weekday for two of our schools.

  4. They are looking to use a closed loop system for cooling, similar to what a car uses. This would minimize water use, yet it will not completely eliminate it. Additionally, a closed loop system is very expensive, so there is no guarantee that it would actually happen.

Fuel-Cell-Microgrid-Powered-300-MW-Connecticut-Data-Center-Updated.jpg

5. The design is intended to minimize noise level; however, that depends on the town’s guidelines. The long-term health impacts of exposure to low frequency sounds are also unknown.

​

6. The interest in the land is due to the gas line which runs under the Gardner’s Nurseries property. This may be the source of fuel to power the data center via fuel cell technology, mainly relying on this rather than traditional grid power, although not currently100% guaranteed.

​

7. Approximately 18 acres of the land are currently reserved for a solar energy field by Greenskies solar out of North Haven in partnership with the state of CT. Bob Foxen (developer) is also looking into acquiring that land.

​

8. The building of the entire data center complex would be done in phases.

​

The current plans are available on the Global Common LLC’s website: https://globalcommon.com/connecticut-data-center-project/

Environmental

Potential disruption to local ecosystems, significant noise pollution from cooling fans, and massive energy consumption that strains the local power grid.

Social

The site's proximity to a new middle school and public park raises serious safety, aesthetic, and quality-of-life concerns for Cromwell families.

Zoning

Current regulations lack specific protections against industrial-scale data centers in residential-adjacent zones, necessitating immediate reform.