Help Protect Cromwell's Future!

Public hearings are an opportunity for Cromwell residents to voice concerns, ask questions, and request that town officials thoroughly evaluate the proposed data center off Geer Street before making decisions that could affect our community for decades.

How to Participate

You do not need to be an expert to speak at a public hearing. Share your concerns as a resident, parent, homeowner, taxpayer, or community member. Make questions, or ask questions that deserve clear, documented answers. Remember that at a public hearing you must follow the commission’s rules which are: Approach the podium, State your Name, State your Address. You have about 2 minutes to voice your concerns!

1. Public Health & Quality of Life

  • Potential exposure to noise, low-frequency sound, and continuous industrial equipment operation.

  • Air emissions associated with fuel cells, backup generators, and other facility equipment.

  • Potential impacts on sleep, stress, and quality of life for nearby residents.

  • Long-term environmental and public health questions that have not yet been adequately evaluated.

Questions to raise: What independent studies will be required to evaluate potential health and environmental impacts? How will the town verify that the facility complies with applicable standards after it begins operating?

2. Noise Pollution

  • Continuous noise from cooling equipment, fans, pumps, transformers, and power-generation systems.

  • Low-frequency noise and tonal humming that may not be adequately characterized by a single dBA measurement.

  • Noise during nighttime hours, when background sound levels are lower.

  • Cumulative noise from all equipment operating simultaneously at full capacity.

Questions to raise: Will a comprehensive, independent acoustic study be required? Will it evaluate nearby homes, schools, and TPC River Highlands? Will enforceable noise limits and ongoing monitoring be required?

3. Air Quality & Fuel-Cell Emissions

  • Emissions from proposed on-site fuel cells and backup generators.

  • The need to evaluate all pollutants and operating scenarios, including emergency generator testing.

  • Potential cumulative effects from other nearby emission sources.

  • Transparency regarding fuel consumption, exhaust locations, emissions rates, and air permitting.

Questions to raise: What pollutants will the facility emit at full build-out? What permits and emissions modeling will be required, and will the supporting information be publicly available?

4. Water Use, Groundwater & Wetlands

  • Verification of actual water demand, including cooling, maintenance, and any required system blowdown.

  • Potential impacts on groundwater recharge, wetlands, drainage, and nearby water resources.

  • Stormwater runoff from buildings, roads, parking areas, and other impervious surfaces.

  • Long-term water resource needs during drought or other periods of water stress.

Questions to raise: What are the projected water demands under normal and worst-case conditions? Has an independent hydrological assessment evaluated potential impacts beyond the property boundaries?

5. Electricity, Energy Infrastructure & Reliability

  • The proposed on-site fuel-cell power system and its dependence on natural gas.

  • Potential new gas infrastructure, pipeline capacity, and associated safety considerations.

  • Electrical grid connections, backup power systems, and future infrastructure requirements.

  • Whether the project's actual energy demands and infrastructure needs could change as the facility expands.

Questions to raise: Will the project require new utility infrastructure? What happens if the proposed on-site power system cannot meet demand or becomes unavailable?

6. Fire Safety, Emergency Response & Public Services

  • Fire risks associated with electrical equipment, batteries if included, fuel cells, and other facility systems.

  • Emergency response requirements and the specialized training or equipment that may be needed.

  • Potential demands on local fire, police, and emergency medical services.

  • Emergency planning for equipment failures, fires, fuel supply disruptions, and other incidents.

Questions to raise: Have Cromwell's emergency services evaluated the facility's full build-out? Who will pay for any additional training, equipment, or infrastructure required?

7. Traffic, Construction & Infrastructure

  • Construction traffic, heavy vehicles, deliveries, and potential road disruption.

  • Impacts on Geer Street and nearby roads during construction and utility installation.

  • Noise, dust, lighting, and other temporary construction impacts.

  • Potential infrastructure upgrades needed to support the project.

Questions to raise: What is the projected construction schedule and traffic volume? Will the town require a traffic impact study and enforceable construction management plan?

8. Land Use, Zoning & Long-Term Development

  • Whether the proposed project is compatible with Cromwell's Plan of Conservation and Development.

  • The scale, height, density, and industrial character of the proposed buildings and equipment.

  • Whether the project could establish a precedent for other large-scale industrial developments.

  • Whether setbacks, screening, buffers, and building locations adequately protect surrounding properties.

  • Whether a zoning text amendment or other regulatory changes are needed to address data centers specifically.

Questions to raise: Does the proposal align with the town's long-term land-use goals? Are existing zoning regulations adequate for a development of this scale and type?

9. Property Values, Community Character & Local Economy

  • Potential impacts on nearby residential property values and future development.

  • Changes to the character of the Geer Street area and surrounding neighborhoods.

  • Whether projected tax revenue adequately accounts for long-term public costs and infrastructure needs.

  • The distinction between construction jobs and permanent operational employment.

  • Transparency regarding tax incentives, abatements, agreements, and the expected net fiscal benefit to Cromwell.

Questions to raise: What is the independently evaluated net fiscal benefit to the town? How many permanent local jobs are expected, and what public costs or incentives should be considered?

11. Schools, Children & Sensitive Receptors

  • Potential environmental impacts on nearby homes, schools, childcare facilities, and recreational areas.

  • The need to evaluate noise and air quality at locations where children spend time.

  • Whether the town and school district have been informed about the proposal and its potential implications.

  • The importance of transparent, evidence-based assessments rather than assumptions about safety.

Questions to raise: Have nearby schools and sensitive locations been included in environmental and noise assessments? What safeguards would be required if concerns are identified?

How to Make Your Public Comment Effective

  • Choose one or two topics that matter most to you rather than trying to cover everything.
  • Ask a specific question that the commission or applicant should answer.
  • Request a concrete action, such as an independent study, additional documentation, enforceable operating conditions, or a public hearing continued until information is available.
  • Keep your comments factual and respectful. Focus on the proposal, evidence, unanswered questions, and potential consequences for Cromwell.
  • Put your concerns on the public record. Written comments submitted to the appropriate commission can help document concerns and requests for further review.

Example of a Short Public Comment

"As a Cromwell resident, I am asking the town not to rely solely on the developer's assurances about the proposed data center. A project of this scale warrants independent evaluation of noise, air emissions, water resources, emergency response, and long-term fiscal impacts. I would like the town to require these assessments, make the supporting data publicly available, and establish enforceable protections before making decisions that could affect our community for decades."

Remember: You have the right to ask questions, request transparency, and advocate for the long-term interests of Cromwell. You do not need to prove that harm will occur to ask for the information needed to evaluate potential risks responsibly.